GRCC needed to make several renovations to their campus to make things more comfortable, sanitary, and efficient for students and staff. GRCC needed to update their domestic water heater system, chiller system, and wanted to upgrade to a sidewalk snow melt system. The age of the equipment was exceeding life expectancy and capacity was at its limits. The staff and the students were having water temperature issues and comfortability issues. GRCC needed a company to take care of their plumbing, water heater, chiller and necessary piping updates in an efficient manner.