EMERGENCY SERVICE | 844.MCM.TEAM

Bronson Lakeview Hospital

Hospital Infrastructure Upgrades for Patient and Staff Safety
Construction Manager
MCM
Cost
$10,000,000
Completion Year
2021

Project Scope

MCM partnered with Bronson Lakeview Hospital to upgrade the facility’s plumbing, medical gas, and HVAC systems to meet current codes and standards. The project was carefully phased to maintain a safe environment for patients and staff throughout the renovation process. MCM provided a variety of services.

Plumbing Systems:

  • Replaced entire hot and cold domestic water system piping
  • Installed new R/O water system
  • Replaced the entire sanitary waste system

Medical Gas Systems:

  • Replaced all medical gas piping and outlets
  • Designed and implemented a new medical gas mechanical room

HVAC Systems:

  • Replaced chillers and boilers
  • Converted from a two-pipe to a four-pipe system
  • Refurbished or replaced air handling units with new controls
  • Added new VAV boxes with updated controls
  • Designed and installed new room pressure controls for operating rooms, pharmacy, and isolation rooms
  • Implemented a new HVAC DDC controls system to replace outdated pneumatic controls

Benefits

  • Improved reliability and longevity of building systems
  • Ensured code compliance for HVAC, plumbing, and medical gas systems
  • Enhanced comfort and safety for patients and employees
  • Increased energy efficiency and real-time monitoring capabilities
  • Developed and implemented a 10-year prioritized plan for continuous improvement

Start Your Project

Ready to work with a team that brings expertise and energy to every project? Trust MCM for results that speak for themselves. Whether tackling complex challenges or delivering top-notch services, we’re here to make it happen—confidently and with intention.