EMERGENCY SERVICE | 844.MCM.TEAM

Bronson South Haven Hospital

Mall City teamed with EV Construction to design and perform the HVAC and plumbing scope for a new two-story 54,000 SF hospital.
Construction Manager
EV Construction
Cost
$5,500,000
Completion Year
2021
Project Size
54,000 SF

Project Scope

Mall City teamed with EV Construction to design and perform the HVAC and plumbing scope for a new two-story 54,000 SF hospital including a full service 14-bed emergency department, imaging suite, lab, phlebotomy suit, 8-bed inpatient medical unit, retail pharmacy, kitchen, administrative suite, waiting areas and family medical practices on the second floor.

HVAC:

  • Designed, fabricated and installed ductwork

Plumbing:

  • Install new sanitary piping system
  • Install refrigeration and condensate pipe
  • Install domestic plumbing system

Medical Gas Piping:

  • Install medical air compressor
  • Provide emergency O2 connection
  • Install and connect all piping to alarm panel
  • Install medical vacuum system

Design Build:

  • Provided pre-construction and design build services
  • Managed budget constraints with multi disciplinary team
  • Managed financial budget with evaluation and value engineering to meet the $22 Million budget.
  • Complete Plumbing, HVAC, and Med Gas Systems

Benefits:

  • Completed the project on time under budget during the confines of the pandemic.
  • Facility designed to provide care for the next 50 years.
  • Achieved an operational and financially viable building for the community.
  • Tridium BMS for optimal energy management with remote monitoring and control.

Start Your Project

Ready to work with a team that brings expertise and energy to every project? Trust MCM for results that speak for themselves. Whether tackling complex challenges or delivering top-notch services, we’re here to make it happen—confidently and with intention.